Construction & Engineering

AI Optimizes Cut-and-Fill Planning on Yorkshire Water Project

Mott MacDonald Bentley used AI to optimize excavation and material-placement sequences on a Yorkshire Water infrastructure project.

On a Yorkshire Water project in the United Kingdom, Mott MacDonald Bentley used AI to optimize cut-and-fill sequences, including the order and locations for excavation and material placement. The application demonstrates how AI can support earthworks planning by evaluating site activities and improving the movement of material. It represents a practical use of automation within infrastructure delivery rather than a purely experimental generative-AI demonstration. The report presents the project as an example of changing construction automation, where data-driven optimization is integrated into established engineering and contractor workflows. Specific financial savings or schedule improvements were not provided in the available coverage.

Original source: PBC Today

Related RAQI solutions

In-depth analysis on RAQI Insight

Work with RAQI