Construction & Engineering

GCC AI data centers face new power, water and carbon demands

GCC data-centre operators are developing more auditable approaches to measuring the power, water, and embodied-carbon impacts of AI infrastructure.

A report on AI data centers in the GCC highlights the region’s shift toward measuring the environmental effects of rapidly expanding AI infrastructure. Khazna Data Centers’ first ESG report, published on 6 October 2026, is cited as evidence that regional operators are moving toward auditable baselines.

The relevant construction and engineering challenge involves measuring power consumption, water use, and embodied carbon in data-centre projects. These metrics affect design decisions, equipment selection, cooling systems, construction materials, and long-term operating performance.

AI data centers require specialized infrastructure and can create significant demand for electrical, mechanical, and civil engineering capacity. Environmental measurement therefore becomes part of project planning rather than a separate reporting exercise.

The development matters for GCC construction because it links AI expansion with sustainability requirements. More transparent baselines could help developers compare projects, identify efficiency opportunities, and incorporate environmental performance into future design and procurement decisions.

Original source: Coral

Related RAQI solutions

In-depth analysis on RAQI Insight

Work with RAQI